Project Review - Legion ALGA Award winners with Sydney CAT100 Carbon injection

Australia's First CAT100® Injection Wins the ALGA 2026 Innovation Award

Legion Drilling and Senversa have won the Australasian Land & Groundwater Association's 2026 Award for Innovation in Contaminated Land and Groundwater Practice. The winning project treated a chlorinated solvent plume in place, beneath a live Sydney road, with no excavation and no road closure.

The award was presented at the Melbourne Cricket Ground on Thursday 12 November 2026. It recognises Australia's first CAT100® injection: ten days on site in Waterloo, followed by twelve months of monitoring that showed more than 90% average reduction in chlorinated hydrocarbons across the monitoring network, and an auditor-issued Site Audit Statement.

The site: a solvent plume under a live Sydney road

The contamination sat beneath a footpath and a dual carriageway with a bus lane in Waterloo, Sydney. Process water leaking from a dry cleaner's trade waste pipeline had left chlorinated hydrocarbons in the soil, groundwater and soil vapour.

Three things made the site hard:

  • The road. The treatment zone was under a live dual carriageway and bus lane that could not be closed.

  • The services. Old, failing services ran through the ground, including critical drinking water infrastructure.

  • The ground. Botany Sands: loose, saturated and very unforgiving of an open excavation.

It was a site where the usual answers did not apply.

Why the standard options were ruled out

Legion Drilling and Senversa have won the Australasian Land & Groundwater Association's 2026 Award for Innovation in Contaminated Land and Groundwater Practice. The winning project treated a chlorinated solvent plume in place, beneath a live Sydney road, with no excavation and no road closure.

The award was presented at the Melbourne Cricket Ground on Thursday 12 November 2026. It recognises Australia's first CAT100® injection: ten days on site in Waterloo, followed by twelve months of monitoring that showed more than 90% average reduction in chlorinated hydrocarbons across the monitoring network, and an auditor-issued Site Audit Statement.

The site: a solvent plume under a live Sydney road

The contamination sat beneath a footpath and a dual carriageway with a bus lane in Waterloo, Sydney. Process water leaking from a dry cleaner's trade waste pipeline had left chlorinated hydrocarbons in the soil, groundwater and soil vapour.

Three things made the site hard:

  • The road. The treatment zone was under a live dual carriageway and bus lane that could not be closed.

  • The services. Old, failing services ran through the ground, including critical drinking water infrastructure.

  • The ground. Botany Sands: loose, saturated and very unforgiving of an open excavation.

It was a site where the usual answers did not apply.

Why the standard options were ruled out

Every standard approach was assessed, and each was ruled out by the site rather than the technology.

Bulk excavation. The engineering controls needed to open a live dual carriageway in loose sand, over poorly mapped services, weren't viable.

In situ chemical oxidation or reduction (ISCO / ISCR). Proven, but it means putting strong oxidants or reductants into ground threaded with failing services, including a drinking water main.

Enhanced in situ bioremediation. It had worked at the site, but product kept entering the leaking drains and the program ran out of time.

Pump and treat, multi-phase extraction. Deployable, but it would commit the landowner to decades of operation with no end date.

There is a deeper problem with liquid reagents and pumping. Both follow permeability: water and reagent move through the most permeable layers. But at older sites, most of the remaining contaminant mass sits in the finer, low-permeability material those layers bypass. Colloidal activated carbon behaves much like a liquid too, so it follows the same paths.

Conventional remedies follow permeability. Contaminant mass doesn't.

CAT100®: trap the contaminant, then destroy it

CAT100® is made by Remediation Products, Inc. (RPI) in Colorado and supplied in Australia through AST Environmental. Zero valent iron (ZVI) is fused with activated carbon at high temperature into a single material. A microbial culture is then added, with slow-fermenting carbohydrates and peptides to feed it.

Injected as a solids slurry, it works three ways at once:

  1. It traps. The activated carbon adsorbs chlorinated hydrocarbons on contact, so migration is controlled from day one.

  2. It breaks contaminants down chemically. The iron sits inside the carbon, so dechlorination happens in the same pores where the contaminant has been trapped.

  3. It breaks them down biologically. The microbes colonise the carbon and are fed by the slow-release substrate.

The second and third mechanisms work together. Ordinary ZVI is used up and loses its reactivity over time. Here, the microbial activity regenerates the iron, so the treatment lasts much longer.

That matters for back-diffusion. Contaminant leaks out of fine-grained material slowly, over years. A reagent used up in weeks can't meet it. A treatment zone that stays active can.

Getting solids where the design says they go

None of the chemistry matters if the material doesn't arrive. Solids injection is where in situ remediation is most often underestimated.

The slurry has to stay in suspension the whole way, from mix tank to pump, manifold, hose and tip. If the carbon settles in the tank, the design is already compromised. If it separates or blocks in the line, the interval is lost. And the slurry is abrasive, pumped at pressure for days.

For this project, Legion Drilling developed and deployed:

  • A mixing and delivery train that keeps solids suspended end to end, with continuous agitation from tank to formation

  • Equipment built for abrasive slurry at sustained pressure: no settling, no separation and no lost intervals across ten days of injection

  • A purpose-built injection spearhead on a Geoprobe direct push rig, compact enough to work in a live road corridor

  • Velocity-varying injection tips that match the energy leaving the tip to the resistance of each interval

  • A designed emplacement grid: overlapping triangles with vertically offset intervals, so the material interlocks through the profile instead of following it

Velocity, not pressure

The point most often missed: you don't set pressure. You set flow and tip geometry, and the ground sets the pressure.

Permeable ground takes fluid easily, so pressure stays low. Tight ground resists, so pressure climbs. Push harder and you don't get into the fines; you fracture to surface or find a service trench and lose the lot.

Varying the exit velocity at the tip changes that. Narrow ports concentrate energy to carry solids into tight material. Wider ports place gently into open ground without running down a coarse seam. Velocity also keeps particles moving, so they don't drop out in the hose or at the port.

Pressure becomes a reading, not a setting. Rising pressure means tight material. A sudden drop means a preferential path, and it's time to stop and move.

When in situ remediation underperforms, the reason is usually distribution. That's a delivery failure, not a chemistry failure.

Results: twelve months of monitoring, then audit sign-off

Senversa, as remediation and validation consultant, ran baseline monitoring before injection and a full performance monitoring program over the following twelve months. It covered groundwater, soil vapour, geochemical indicators and microbial populations.

After twelve months:

  • Total chlorinated hydrocarbons fell by up to 99.6% in individual wells

  • The average reduction across the monitoring network was more than 90%

  • Some wells recorded decreases of up to three orders of magnitude

  • Target bacteria and functional gene populations increased by up to 9,900%

  • A Site Audit Statement was issued

The microbial data answers the obvious challenge to any carbon-based remedy: is the contaminant being destroyed, or just held on the carbon?

The increase included organisms that fully break down vinyl chloride to ethene. That shows biological degradation is happening, and that it runs to completion instead of stalling at vinyl chloride, the key risk in any reductive dechlorination.

The result that matters most to a landowner is the last one. A Site Audit Statement was issued twelve months after injection: third-party, regulator-facing confirmation that the remediation worked, on a timeframe that fits a development program.

Why it won, and why it matters for site owners

Innovation made up 25% of the judging criteria. Measurable outcomes made up 40%. This project didn't win because the technology was new to Australia. It won because the data held up and a third party signed it off.

There's a persistent belief in Australian contaminated land practice that in situ remediation is too slow for a development program. It's the main reason so much remediation in Sydney still defaults to dig and dump: excavate, truck it away, and let landfill inherit the problem.

This project tested that belief on a site where nothing conventional was viable:

  • Ten days on site

  • More than 90% average reduction across the network within twelve months

  • A Site Audit Statement in hand

  • No excavation and no road closure

Digging contamination up isn't remediation. It's relocation. The contamination doesn't disappear; it changes postcode.

Change the chemistry. Not the postcode.

The team behind it

This award belongs to a team.

  • Emmylou Cooke, Senversa: remediation design, the validation program and the science that carried the case

  • Mike Mazzarese, AST Environmental: technical support and design input from Colorado, and the confidence to back a first-in-country application

  • Remediation Products, Inc. (RPI): manufacturer of CAT100®

  • Alex Dudkowski, Legion Drilling: fieldwork, with ten days of solids injection in a live road corridor without a lost interval

  • Richard Halliday, Legion Drilling: bid preparation, variations and project commercials

Thank you to ALGA, the Awards Committee and the judges, and congratulations to every finalist and winner on the night.

Talk to us about in situ remediation

Legion Drilling is a sonic, environmental and geotechnical drilling contractor with depots in Sydney, Brisbane, Townsville and Albury-Wodonga.

If you have a chlorinated solvent plume, a constrained site, or a development program that can't absorb an excavation, request a quote or call 1300 131 019.

Next
Next

Albury-Wodonga Drilling Services for Regional NSW, Victoria & ACT